• Construction of PPP Project in Mengzhou Culture and Sports Center

          PPP+EPC Model
            The project includes five projects: Mengzhou Shuangchuang Center, Mengzhou No. 1 Middle School, Mengzhou Sports Center and Mengzhou Cultural Activity Center. The total investment of the project is 1.432 billion yuan, and the cooperation period is 20 years. The total area of the project is 617,186.7 square meters and the total building area is 285,675 square meters.
          • EPC+PPP Project of Yangde Road Construction Project in Xuancheng City

            PPP+EPC Model
              The project is located in the east of Xuancheng City, the urban section of Wutun Highway, from Wanxi Road in the west to Lingyang Road in the east. The total length of the road is about 4600 meters, and the width of the road is about 60 meters. It belongs to the main traffic road. The municipal comprehensive pipeline corridor along the line is about 4100 meters in length, with 6 bridges in the whole line. Total project investmentAbout 1.24 billion yuan. The duration of project cooperation is 11 years, of which the construction period does not exceed 3 years.
            • Comprehensive Urban and Rural Governance and Development of PPP Project in Wuqi County

              PPP+EPC Model
                This project is a PPP demonstration project of the Ministry of Finance. Including Wuqi small watershed comprehensive renovation project, Wuqi municipal upgrading project (including road engineering, bridge engineering, comprehensive corridor engineering, urban landscape upgrading), Wuqi Red Town Tourism Distribution Center project. The project is operated by DBFOT (design-construction-financing-operation-transfer) for 12 years, including 2 years of construction and 10 years of operation.
              • PPP Project of Jinghe Scenic Belt (Phase I) in Gaoling District of Xi'an City

                PPP+EPC Model
                  The project is located in Gaoling District, Xi'an City, Shaanxi Province. It mainly includes landscape planning, landscape water supply and drainage design, electrical design, landscape water ecosystem construction, sponge city construction, and river protection. The total investment of this project is 1.278 billion yuan, and the cooperation period is 20 years, of which the construction period is 3 years and the operation period is 17 years.